Step 2 β Project Requirements ChecklistRequired for SA scoping
Indicate the current status of each item. Drives SA scoping, turnaround time, and quote accuracy. Readiness score updates live in the panel on the right.
π Floor Plans / Layout (to upload layout)
π Bill of Quantities (BOQ)
π Dimensions
π¨ Finish Specifications
β¨ Design Intent / Look & Feel
π° Project Reference / Budget
Note: Cut sheets & detailed drawings are prepared by JEB upon project confirmation. For returning clients, please reference your JEB Account Manager for any existing documentation.
π Readiness score
62%
Partial readiness β SA can scope but expect some assumptions in initial quote
Driving:
β’ Layout: β confirmed (+15%)
β’ BOQ: partial (+8%)
β’ Dimensions: partial (+8%)
β’ Finishes: partial (+8%)
β’ Design intent: provided (+13%)
β’ Reference: returning (+10%)
β± Estimated SA turnaround: 3-4 working days based on current readiness Β· would be 2 days at 80%+
Score updates as you fill checklist Β· saved with brief